Indicative triage, not a design tool

What size steel beam do you need?

Answer two questions, the span and what the beam carries, and we'll show the section range typically specified on UK domestic jobs like yours: openings to about 3 m with a floor above usually land between 152x152 UC23 and 203x203 UC46. Then get the real answer. Beam sizing is a structural engineer's calculation, and building control will ask for the calcs.

Question 1

What is the clear span of the opening, in metres?

Measure the structural opening. The beam itself will be longer, allowing roughly 150 mm bearing at each end. Between sizes? Round up.

Scope of this checker

  • Openings in load-bearing walls: doors, knock-throughs, bifold openings
  • Chimney breast removals and floor-plus-roof loads over an opening
  • Spans from under 1 m to 6 m, and a straight answer above 6 m
  • Indicative UC/UB section ranges only, drawn from typical UK domestic practice
  • Every route ends the same way: a structural engineer's calculation to BS EN 1993, which building control requires

Steel Beam Checker is an independent information site operated by Ellul Solutions Ltd. It is not affiliated with any engineering institution, steel supplier or building control body. Nothing on this site is structural engineering advice and no output here is a beam specification: sizing is a structural engineer's calculation under BS EN 1993 and the Building Regulations, and building control requires those calculations. Never order steel from this checker.

Indicative steel section ranges on UK domestic jobs

Last updated

The span and load bands the checker uses, with the UC/UB ranges typically specified on comparable UK domestic jobs. This is observed practice, not a span table: every row still needs an engineer's calculation.

Bands assembled from published UK domestic structural examples and steel supplier guidance, with section names checked against the SCI Blue Book listings. They describe what is commonly specified, not what your job needs: beam sizing depends on measured loads, deflection limits, bearing and restraint, and is a structural engineer's calculation under BS EN 1993. Building control requires those calculations, so never order steel from this table.

Indicative steel section ranges on UK domestic jobs
Clear spanSupportingSections typically specifiedWhat usually governs
Up to 3 mDomestic floor only152x152 UC23 to 203x203 UC46Strength and simple bearing
Up to 3 mFloor plus roof, or masonry203x203 UC46 and up, sometimes pairedLoad path and padstone design
3 to 4.5 mDomestic floor only203x203 UC46 to 254x146 UB37Deflection starts to matter
3 to 4.5 mFloor plus roof, or masonry254 to 305 series UB, or heavy UCDeflection and headroom
4.5 to 6 mDomestic floor only254x146 UB37 to 305x165 UB46Deflection
4.5 to 6 mFloor plus roof, or masonry305 to 356 series UB, sometimes paired or a frameDeflection, restraint, connections
Over 6 mAnythingNo indicative range offeredEngineered design throughout
  • UK openings up to about 3 m with a domestic floor above typically see 152x152 UC23 to 203x203 UC46 specified, but the exact section is always a structural engineer's calculation.
  • A structural engineer's calcs for a single domestic beam typically cost £250–£500 in 2026, against £1,550–£3,200 for the whole beam job installed.
  • Building control will not sign off a structural opening without calculations: a span table or online checker is not acceptable evidence.

Cite this page

“Indicative steel section ranges on UK domestic jobs”, Steel Beam Checker, https://steelbeamchecker.co.uk/ (updated 2026-08-14). Bands assembled from published UK domestic structural examples and steel supplier guidance, with section names checked against the SCI Blue Book listings. They describe what is commonly specified, not what your job needs: beam sizing depends on measured loads, deflection limits, bearing and restraint, and is a structural engineer's calculation under BS EN 1993. Building control requires those calculations, so never order steel from this table.

Get a structural engineer's calcs

Tell us about the opening and we'll introduce you to a structural engineer who handles domestic beam calcs for jobs like yours.

  • Free to ask, no obligation
  • Your details go only to the engineers who respond
  • No marketing lists, ever

Go deeper

Sourced, dated, kept current.

Frequently asked

What size RSJ do I need for a 3 m span?

On comparable UK jobs with only a domestic floor above, engineers typically specify between 152x152 UC23 and 203x203 UC46 over spans up to about 3 m. That is an observation from typical practice, not a design: your beam must be calculated by a structural engineer, and building control will ask for the calcs.

What size RSJ do I need for a 4 m or 5 m span?

Floor-only spans of 3–4.5 m typically land between 203x203 UC46 and 254x146 UB37, and 4.5–6 m spans in the 254 to 305 series UBs, deeper again with roof or masonry above. Indicative only: deflection usually governs at these spans and only calculation settles it.

How much do steel beam calculations cost?

Typically £250–£500 in 2026 for a single domestic beam from a structural engineer, more for multiple beams or complex load paths. The installed beam job typically runs £1,550–£3,200 all in, so the calcs are the smallest line and the only legally load-bearing one.

Can I use a free steel beam calculator instead of an engineer?

Not for approval. Building control requires calculations from a competent person who takes professional responsibility for them, an anonymous web calculation, a span table or this checker's output does not qualify. Online tools, ours included, are for orientation before the engineer, not instead of one.

What is the difference between a UC and a UB?

Both are I-shaped steel sections. UCs (universal columns) are squarer and shallower, so they hide in floor zones and 215 mm walls, which is why they dominate small domestic openings. UBs (universal beams) are deeper and carry bending more efficiently, so they take over as spans grow, at the cost of depth below the ceiling.

Do I need building control approval to fit an RSJ?

Yes. Removing or opening a load-bearing wall is notifiable building work under the Building Regulations: you tell building control via full plans or a building notice, they check the engineer's calcs and the installed work, and issue a completion certificate at the end. Selling without one means regularisation later.

Two questions, then the right next step

See the typical section range, then get the calcs that count.